Nuclear Power Plant roofing new shelter
(2006) Tender advice on the design of roofing steel structures for Chernobyl reactor, design of assembly and erection. Steel structures weight about 25.000 tons, consisting of a 250 m wide 120 m high arc to be entirely assembled on the ground floor, lifted up and subsequently translated above the reactor. Erection and Assembly design method patented in Italy and Ukraine.